Illustrative independent optical-population event cadence

about 110 s between flaps; about 1 h between hard failuresmodeled

Value kindmodeled — Interpret this value according to its displayed kind, scope, source, and as-of date.
ScopeIllustrative assumed rates, not measured fleet telemetry. Count modules, not duplex links, and model common-cause faults separately. Component events become job interruptions only through topology, recovery and the jobs each event touches. The paper's own prose figures for ten million optics (a flap about every 48 s, a hard failure every few days) do not follow from these per-optic inputs; the guide uses only the inputs.
As of2026-03-04
SourcePer-optic assumptions (10^7 h hard MTBF, 3x10^5 h mean time to flap) from an unattributed OCP working-session slide (2025-11-06), as reproduced in Borrill, arXiv 2603.03736 v2 (2026-09-09), which does not validate them; the guide recomputes the aggregate for exactly 10M modules. · Introduction and Table 1; per-optic assumptions ~10^7 h hard-failure MTBF and ~3x10^5 h mean time to flap
DerivationAssume exactly N=10,000,000 optical modules, M_flap=300,000 h and M_hard=10,000,000 h, independent constant rates. M_flap/N*3600=108 s; M_hard/N=1 h. Display rounding: about 110 s and about 1 h.
Reviewchecking…review by 2027-03-01 · standard cadence
Recorded changeslast 2026-10-16 · 5 revisions tracked
Claim idlink-flap-cadence-in-a-10m-optic-fleet-hard