The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

Ideal two-region active-active serving capacity factor for loss of either equal region

2× serving capacityderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeEqual compatible regional throughput, full displaced-peak service, no second simultaneous regional loss. Storage, transfer, licenses, reservations and operating costs are priced separately.
As of2026-09
SourceAWS Prescriptive Guidance states a typical multi-Region architecture can cost about twice a single-Region one and that hot standby doubles workload cost; the 2× here is a guide-derived capacity factor, so storage, transfer and licenses are priced separately. · Well-Architected Reliability Pillar REL13 DR patterns; Prescriptive Guidance Multi-Region fundamental 1 (cost paragraph)
DerivationIf total peak requires L units and either of two regions must serve L after peer loss, installed capacity is 2L. With r equal regions and one-region-loss protection, ideal installed capacity is rL/(r−1), before rounding and performance headroom.
Reviewchecking…review by 2027-09-05 · fast cadence
Recorded changeslast 2026-10-19 · 5 revisions tracked
Claim idinfrastructure-cost-of-active-active-carry-a

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.