Worked example (hypothetical Rack A and hall): shortfalls that hold the rack release
2.0 kW room-air deficit; 0.10 m rear-clearance deficitderived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | Hypothetical Rack A and hall from Chapter 7.13's worked example. Electrical (12 kW) and liquid (20 kW) margins are spare; room air and rear service clearance fail. The week-14 release date survives only if both are fixed by week 12; fixing them in week 15 gives week 17. The derivation is in the chapter and in this claim's derivation field. |
| As of | 2026-09 |
| Source | Guide-authored hypothetical scenario, September 8, 2026; no supplier quote or test measurement. |
| Derivation | Electrical margin = 132−120 = 12 kW; liquid-duty margin = 120−100 = 20 kW; room-air deficit = 20−18 = 2.0 kW. Coolant rise = 100 kW/(2.0 kg/s × 4.18 kJ/(kg·K)) = about 12 K, so return is about 52 °C, below 55 °C at the assumed flow. Rear-service deficit = 0.90−0.80 = 0.10 m. The nominal release is max(9,11,10,12) + 2 = week 14, but air and access failures block it. Both must be corrected by week 12 for the two-week test to finish by week 14; correcting them in week 15 instead gives week 17. |
| Review | checking…review by 2027-03-08 · standard cadence |
| Recorded changes | last 2026-10-19 · 2 revisions tracked |
| Claim id | guide2-t29-7-13-result |