Raw capacity for the stated one-petabyte erasure-code placement case

about 1.8 PB rawderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeWorked-example value, not a measurement: 1.0 PB of logical data under an (8,3) erasure code (11/8 = 1.375x) with 25% of raw capacity held free. Triple replication at the same reserve needs 4.0 PB raw. Rerun it with your own code, logical size and reserve.
As of2026-09
SourceWorked example in Chapter 9.6 (erasure-code placement case; assumptions stated in the chapter)
Derivation1.0 PB × (8+3)/8 / (1−.25) = 1.8333333333333333 PB raw; select the next eligible hardware configuration.
Reviewchecking…review by 2027-03-05 · standard cadence
Recorded changeslast 2026-10-19 · 2 revisions tracked
Claim idguide2-t23-object-raw-capacity