Illustrative all-in capacity cost for one fleet-hour: Chapter 1.8's three-year owned cost for the same 64-GPU fleet
$156/fleet-hourmodeled
| Value kind | modeled — Interpret this value according to its displayed kind, scope, source, and as-of date. |
|---|---|
| Scope | 1.3 ledger only, 64 installed GPUs including idle and reserve. Equals Chapter 1.8's owned case, (K/A + O)/8,760 hours with K = $2.4M, O = $0.40M/year and A = the three-year annuity factor at 10% (about 2.487): about $2.4 per installed GPU-hour. Common downstream application cost excluded from the output ratios. Assumed sensitivity: 126–206 $/fleet-hour, from Chapter 1.8's K ($2–3M) and O ($0.30–0.60M/year) bounds. |
| As of | 2026-10-19 |
| Source | Guide assumption, 2026-10-19, derived from Chapter 1.8's owned-fleet inputs. Epoch supplies the cost method, not these prices. |
| Review | checking…review by 2027-04-19 · standard cadence |
| Recorded changes | last 2026-10-19 · 2 revisions tracked |
| Claim id | guide2-serving-hour-cost |