ERCOT NOGRR 282 Large Computational Load voltage ride-through: below 0.8 pu the load may reduce consumption, and must return to at least 90% of its pre-disturbance consumption within 2 s of voltage at the POI recovering above 0.90 pu
≥90 % of load within 2 s (reduction allowed below 0.8 pu)observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Applies to non-exempt LCLs (at least 75 MW aggregate peak demand, at least 50% power-electronic computational load); voltage is Operating Guides §2.15, frequency §2.6.4. PUCT approved 2026-07-09, effective 2026-08-01. Where voltage fell below 0.8 pu, a load that transfers to another source or stabilizes its controls must begin returning power within 0.25 s and reach 90% within 0.5 s, both timed from voltage recovering above 0.9 pu. Cooling and mechanical loads may trip below 0.35 pu and are then excluded from the recovery calculation. A stricter 0.5–0.8 pu profile applies once a load satisfies Planning Guide §9.5 after 2028-01-01, regardless of energization date. |
| As of | 2026-07-09 |
| Source | ERCOT NOGRR 282 as amended by ERCOT's 5/11/26 comments; PUCT approval 2026-07-09; PJM Planning Committee summary of the final approved version (2026-09-08) · Operating Guides §2.15(3) |
| Review | checking…review by 2026-12-31 · standard cadence |
| Recorded changes | last 2026-10-19 |
| Claim id | guide2-ercot-nogrr282-lel-voltage-recovery |