Appendix C GB300 complete-system default and cost per installed GPU

~$6.25M/system; ~$86.8k/installed GPUderived

Value kindderived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method.
ScopeAssumed GB300 complete system; network and facility separate. The $86.8k per installed GPU rests on one March 2026 report of $6.0–6.5M per rack that cites anonymous sources; replace it with a quote.
As of2026-09-08
SourceGuide derivation from Appendix C’s assumed GB300 complete-system default: $86,800 per installed GPU × 72 installed GPUs; not an observed market quote. · web/lib/scenario.mjs, HARDWARE["gb300-nvl72"]: costPerGpu 86800, gpusPerRack 72; generated Appendix C default and GPU TCO input row.
DerivationPinned assumed complete-system cost $86,800 per installed GPU × 72 installed GPUs = $6,249,600/system; three-significant-figure display about $6.25M/system and $86.8k/installed GPU. September 8, 2026 dates this scenario snapshot, not a market observation.
Reviewchecking…review by 2027-01-31 · fast cadence
Recorded changeslast 2026-09-16
Claim idguide2-b-gb300-complete-system-default