OCP Project Deschutes CDU specification 1.0.0 (Google-contributed): 2,000 kW at a 3 °C approach, 500 GPM, 80–90 psi IT differential pressure available, 0.2-µm side-stream filtration
2 MWobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Design targets in the published specification, not a tested rating of any vendor's unit. The 2,000 kW rides on 500 GPM, the spec's 0.25 GPM/kW: about 0.95 L/min per kW, a rise of about 15 K on water. Racks that need OCP's typical 1.5 L/min per kW get about 1.26 MW from that flow. The same table gives 0–130 psig operating pressure, 18–55 °C operating liquid, DI water or PG25, 74 kW power consumption and 6,900 lb wet. Full-flow filtration is 25–44 µm with a separate 0.2 µm side stream of about 3 GPM. Several vendors list units built to the design; their ratings are their own. |
| As of | 2026-02-26 |
| Source | OCP, Project Deschutes: Data Center Facilities Specification 1.0.0 (Google), effective 2026-02-26 · §3.1 technical specification summary table; §3.2 product requirements items 6–7; §5 performance table |
| Review | checking…review by 2027-04-14 · slow cadence |
| Recorded changes | last 2026-10-17 · 3 revisions tracked |
| Claim id | google-project-deschutes-gen-5-row-cdu-3-and |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.