HPE GB200 NVL72 fully loaded mass with PGW; obtain a separate shipping/rigging inventory

3,245 lb (about 1.47 t) fully loaded with PGWobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeOne HPE GB200 configuration, not GB300 or a generic NVL72 shipping mass. Guide unit conversion uses 0.45359237 kg/lb; about 1.47 t. Packaging, shipping state and foot/wheel/rigging reactions require the selected OEM inventory.
As of2026-09
SourceHPE — NVIDIA GB200 NVL72 QuickSpecs, System Unit Specifications. · System Unit Specifications: Weight (approximate), Fully Loaded (with PGW): 3245 lbs.
Reviewchecking…review by 2027-04-01 · standard cadence
Recorded changeslast 2026-10-15 · 3 revisions tracked
Claim idgb200-gb300-nvl72-shipping-weight-3-000-lb-in-a