Vertiv CoolCenter fully loaded tank mass; the manual separately reports footprint-average bearing pressure without support frames

1,732–2,095 kg loadedobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeVertiv's manual assumes 15 kg of server per U. Its 1,679-1,721 kg/m2 values are footprint-average screening pressures, not support-frame or leg reactions. Structural acceptance needs the actual support reactions, move and installation loads, load combinations and the floor-system criteria.
As of2025
SourceVertiv · Table 4.5: fully loaded tank mass and footprint-average bearing pressure without support frames
Reviewchecking…review by 2027-10-14 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idflooded-tank-point-load-can-exceed-800-kg-m