energy savings at two live commercial buildings (DeepMind with Trane Technologies); evaluation, offline learning and constraint satisfaction were the obstacles

~9% & ~13%observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2022
SourceDeepMind with Trane Technologies, Controlling Commercial Cooling Systems with RL (arXiv:2211.07357) · Abstract: live experiments at two facilities achieved approximately 9% and 13% energy savings
Reviewchecking…review by 2027-10-16 · standard cadence
Recorded changeslast 2026-10-16 · 3 revisions tracked
Claim idenergy-savings-at-two-live-commercial-buildings