Alarm-flood threshold used by ANSI/ISA-18.2-2016, IEC 62682:2022 and EEMUA 191 (Ed. 4, 2024): more than 10 alarms in 10 minutes per operator

>10 in 10 minobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2024-11 (EEMUA 191 Ed. 4; IEC 62682:2022, adopted in Europe as EN IEC 62682:2023; ISA-18.2-2016 current)
SourceEEMUA Publication 191 Edition 4 (November 2024); ANSI/ISA-18.2-2016; IEC 62682:2022 (Ed. 2.0; EN IEC 62682:2023) · Figure 2 and accompanying paragraph; an alarm flood is measured by periods when an operator receives more than 10 alarms in 10 minutes.
Reviewchecking…review by 2027-10-16 · fast cadence
Recorded changeslast 2026-10-19 · 3 revisions tracked
Claim ideemua-191-isa-18-2-alarm-flood-threshold-and