NVIDIA DCGM exporter default metric collection interval (-c / DCGM_EXPORTER_INTERVAL)
30 s (30,000 ms)observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Default of the exporter's collection loop; operators set it per deployment. The Prometheus scrape interval is configured separately, and XID/SXID driver events are better taken from the event path than from the scrape. |
| As of | 2026-10 |
| Source | NVIDIA, DCGM-Exporter documentation (GPU telemetry) · Command-line options: '-c … Interval of time at which point metrics are collected. Unit is milliseconds. Default: 30000' |
| Review | checking…review by 2027-10-19 · standard cadence |
| Recorded changes | last 2026-10-19 |
| Claim id | dcgm-exporter-default-collection-interval |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.