Google Brazos liquid-to-air sidecar, nominal rack thermal load (three modular units; sidecar or in-rack); no facility-water re-plumb

~60 kW/rackobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
Caveat60 kW is Brazos's nominal thermal rating. It is not a ceiling for liquid-to-air cooling as a class: other liquid-to-air units are rated higher, and the limit in a hall is the room's air-rejection capacity.
As ofGoogle 2026-06-16; OCP spec v0.75.4 effective 2026-09-11
SourceGoogle Cloud blog (Brazos); Google/OCP, Project Brazos specification v0.75.4 · Google blog: Brazos is generally available; OCP specification v0.75.4: rack thermal capacity (nominal) of 60 kW across three modular units; effective 2026-09-11, public by 2026-10-14
Reviewchecking…review by 2027-06-01 · standard cadence
Recorded changeslast 2026-10-14 · 2 revisions tracked
Claim idclosed-loop-l2a-sidecar-capacity-google-brazos