ProphetStor-reported CDU energy saving in its Proven Benefits discussion
22–28%observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | The reported range belongs to the supplier’s Proven Benefits discussion; it is not established as the result of the separate twenty-job, single-server integration test. |
| Caveat | A supplier-reported figure from its own Proven Benefits discussion; compare matched useful output and facility energy before choosing predictive supervision. |
| As of | 2026 |
| Source | ProphetStor, Predictive Liquid Cooling for AI Data Centers, Proven Benefits discussion (undated supplier page). · Proven Benefits: 22–28% lower CDU energy versus fixed flow; separate integration-test setup and manually applied recommendations |
| Review | checking…review by 2027-04-14 · standard cadence |
| Recorded changes | last 2026-09-16 · 3 revisions tracked |
| Claim id | cdu-energy-saved-by-predictive-control-while |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.