The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

AMD ROCm 10.1.0 release, 5 October 2026

ROCm 10.1.0 (release snapshot)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeVersioned software release; hardware, OS, model operators and communication features require the selected compatibility matrix. Known issues: RCCL all-reduce with the Low Latency (LL) protocol might produce incorrect results on MI350 Series GPUs (workaround NCCL_PROTO=LL128,Simple); Hugging Face training of BERT, RoBERTa-large, DistilBERT-base and GPT-2 on MI350X might take 6–22% longer than expected (first reported in 10.0.0; stated in the latest release notes). Not an assertion of equal performance or complete API coverage.
As of2026-10-05
SourceAMD ROCm release notes, version 10.1.0, 5 October 2026 (known issues).
Reviewchecking…review by 2026-11-16 · standard cadence
Recorded changeslast 2026-10-12 · 5 revisions tracked
Claim idamd-stack-with-rccl-nccl-api-parity-mi350x

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.