The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

AMD MI355X MXFP4 matrix peak, CDNA4

~10.1 PFLOPSobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
CaveatAMD publishes no structured-sparsity figure for MXFP4 or MXFP6. MXFP6 runs at the same 10.1 PFLOPS on CDNA4.
As of2026-10
SourceAMD Instinct MI355X GPU brochure, peak theoretical performance table · Peak theoretical performance table: MXFP4 10.0663 PFLOPS, MXFP6 10.0663 PFLOPS, sparsity column N/A
Reviewchecking…review by 2027-04-16 · standard cadence
Recorded changeslast 2026-10-15 · 2 revisions tracked
Claim idamd-mi355x-fp4-sparse-cdna4-with-native-fp6

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.