Vertiv Liebert CRV chilled-water in-row units: net sensible cooling capacity per unit
27.1 / 46.3 / 53.2 kW per CW unitobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | CR032, CR040 and CR050 respectively, at 95 F return dry bulb and 23% RH; CR032 and CR040 at 45/55 F entering/leaving water, CR050 at 55/68 F. The CR035 DX and water/glycol variants have separate schedules. Converting a per-unit duty into kW per rack depends on the number of units serving the row, airflow distribution, containment and the redundancy case. It is not a rating for a close-coupled fan wall. |
| As of | 2025-05 |
| Source | Vertiv · Vertiv Liebert CRV SL-71133 R05/25, p. 4, chilled-water schedule |
| Review | checking…review by 2027-10-14 · standard cadence |
| Recorded changes | last 2026-10-14 · 3 revisions tracked |
| Claim id | active-in-row-cooler-capacity-per-rack |