The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › W45

W45

ASHRAE's liquid-cooling classes keyed to maximum facility-water supply temperature, where a higher number means warmer water: less chiller capex and heat-reuse potential, less thermal headroom.

Also written as: W17 · W27 · W32 · W40

Current numbers

89 L/min at 35 °C supply (59 L/min at 25 °C; 177 L/min at 45 °C)Lenovo GB300 NVL72 required rack flow by supply temperature (W45-rated); the ladder's 35 °C rowas of 2026-08-30 · register ↗
~45 °CLenovo's GB300 (W45) and NVIDIA's Rubin platform accept coolant up to ~45 °C, adding chiller-less hours without guaranteeing them year-roundas of 2026-06 · register ↗
5th ed. (2021)ASHRAE fifth edition: W17/W27/W32/W40/W45/W+; new W40 and H1as of 2021 · register ↗

← All terms