VAC · Volts alternating current
The unit naming conventional AC distribution down to server power supplies, the incumbent baseline that facility-level DC architectures are measured against.
Current numbers
+157%Power gain NVIDIA claims for 800 VDC over 415 VAC through the same wire gauge (Oct 2025; no basis published)