Tokens-per-watt
Throughput per power under the same controlled conditions and boundary: (tokens/s)/W = tokens/J. “Tokens/W” is shorthand only when model/version, workload, token accounting, precision/quality, context, batch/concurrency, latency, utilization, and measurement boundary are stated.