The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › TFLOPS

TFLOPS · trillion floating-point operations per second

The throughput ladder for accelerators, rising through PFLOPS and EFLOPS; always read alongside the precision and sparsity assumptions, because the headline figure quotes the most favorable ones.

Also written as: PFLOPS · EFLOPS · ExaFLOPS

Current numbers

192 GBHBM3E per Ironwood (TPU v7) chip @ 7.37 TB/s; 4,614 FP8 TFLOPS; 6x memory vs Trilliumas of 2026-03 (GA) · register ↗
192 GB / 7.4 TB/sHBM3E per Ironwood TPU v7 (inference-era ASIC); 9,216-chip pods, 42.5 FP8 ExaFLOPS, 4,614 FP8 TFLOPS/chipas of 2025 · register ↗

← All terms