The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › STATCOM

STATCOM · Static Synchronous Compensator

An inverter-based device that injects or absorbs reactive power within milliseconds to hold voltage at a bus or the point of interconnection. It responds faster than switched capacitor banks.

← All terms