The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › SerDes

SerDes · Serializer/Deserializer

The circuit converting parallel data to a high-speed serial stream and back; lane rate sets link bandwidth.

Current numbers

100-200 Gb/sPAM4 SerDes per-lane rate driving 800G/1.6T links — FEC-mandatory, BER-screening-criticalas of 2026-10 · register ↗
224G-class electricalElectrical SerDes class; get the exact signaling and FEC for your interfaceas of 2026-02-10 · register ↗

← All terms