Power factor
Ratio of real power (kW) to apparent power (kVA); a low power factor wastes capacity through reactive current.
Also written as: PF
Current numbers
0.8 PFlagging power factor a reactive load bank loads the chain to — proving generator/UPS at kVA rating, not just kW