The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
GuideGlossaryPDU

PDU · Power Distribution Unit

Equipment that distributes electrical power to racks; rack PDUs are the metered strips feeding individual servers.

Current numbers

Model each installed object separatelyplanning roll-up only: rack, floor CDU, and PDU are separate objects with separate locations, load states, and reactionsas of 2026-08-24 · register ↗

← All terms