The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › PAM4

PAM4 · Pulse Amplitude Modulation, 4-level

Four-level signaling that carries two bits per symbol to double lane rate, at the cost of a much smaller eye that makes forward error correction and transmitter margin mandatory.

Current numbers

100-200 Gb/sPAM4 SerDes per-lane rate driving 800G/1.6T links — FEC-mandatory, BER-screening-criticalas of 2026-10 · register ↗

← All terms