OEM · Original Equipment Manufacturer
A systems vendor that turns chipmakers' reference designs into deployable servers and racks; the integration, support, and warranty point between silicon and operators.
Also written as: OEMs
Current numbers
2.3 kW TDP support per Rubin GPU (Pegatron)Pegatron's published TDP for each Rubin GPU in its RA4803-72N3 rack; an OEM rating, not measured draw
>60–64%H/HA-class combined-cycle efficiency, against about 43–44% in simple cycle; OEM delivery slots span 2028–2032; 24–36 month installs
~25–50 µmFull-flow TCS filtration (follow the rack OEM's requirement); side-stream polishing can be sub-micron, 0.2 µm on Deschutes-design units