The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Non-blocking

Non-blocking

A network that can carry full bandwidth between all node pairs simultaneously with no internal contention (1:1).

Current numbers

1:1 non-blockingNVIDIA's reference training back-end: a non-blocking, two-tier, rail-optimized fat tree; inline L7 inspection costs goodput thereas of 2025 · register ↗

← All terms