The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › FRU

FRU · Field-Replaceable Unit

A component designed to be swapped on-site, such as a power supply, fan or drive, without sending the whole system back.

← All terms