DAC · Direct Attach Copper
A copper cable carrying high-speed signals over short reach, cheaper than optics for in-rack and adjacent links.
Current numbers
~1–2 m DAC; up to 7 m AECCopper reach at 800G-class rates: passive DAC vs AEC, optics beyond — verify the channel at 224G/lane