CVE · Common Vulnerabilities and Exposures
The public identifier for a disclosed vulnerability; GPU-stack, container-runtime, and BMC entries drive the patch cadence a fleet has to sustain without killing jobs.
Also written as: CVEs
Current numbers
≤1.17.7NVIDIA Container Toolkit versions vulnerable to CVE-2025-23266/NVIDIAScape — through 1.17.7; NVIDIA GPU Operator affected through 25.3.1
CVSS 9.0NVIDIAScape (CVE-2025-23266) Container Toolkit escape — container-to-host on shared GPU nodes
CVSS 2.5CVE-2025-23290: vGPU Manager cross-VM GPU-metric information exposure