The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
GuideGlossaryCold plate

Cold plate

A liquid-cooled metal block clamped to a chip that conducts heat into the coolant in a direct-liquid-cooling loop.

Current numbers

~1.25–2.0 L/min/kWDLC flow rule of thumb (PG-25 coolant, ~7.5-12 C delta-T at the cold plate)as of 2025 · register ↗

← All terms