The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Checkpoint

Checkpoint

A periodic save of model weights and optimizer state so a long training run can resume after a failure.

Current numbers

2.45–14 TB (exact assumed layout)Exact constructed checkpoint layout: 175 billion × 14 B = 2.45 TB; 1 trillion × 14 B = 14 TBas of 2026-09-08 · register ↗
age of newest surviving captured statetraining lost-work boundary: captured progress in the newest valid checkpoint whose durable copy and recovery dependencies survive the disasteras of 2026-08-24 · register ↗
~14 bytes/paramCheckpoint state per parameter under a BF16 / FP32-master / Adam mixed-precision recipe (assumed, not measured)as of 2026 · register ↗

← All terms