BER · Bit-Error Rate
The fraction of transmitted bits received in error; a key quality metric for high-speed optical and copper links.
Current numbers
100-200 Gb/sPAM4 SerDes per-lane rate driving 800G/1.6T links — FEC-mandatory, BER-screening-critical
1e-12ibdiagnet v2.13.0 --ber_test default BER threshold, valid only for SwitchX and ConnectX-3/-4