The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › ASCE

ASCE · American Society of Civil Engineers

The body behind the loading standard that assigns a facility its Risk Category and sets seismic anchorage and flood-elevation requirements — structural costs fixed at siting.

Current numbers

500-yr (0.2%)Flood hazard area for Risk Category II+ under ASCE 7-22 Supplement 2; ASCE 24 freeboard on critical facilitiesas of 2024–2025 · register ↗

← All terms