  1. published 2026-07-13 · submitted 2026-07-13 · Chapter 15.5
    warm-water DLC (45–60 °C+) often does not [need a heat-pump lift]

    Corrected the heat-reuse thermodynamics: a 45–60 °C return cannot supply a 60–70 °C (3G) network without a heat pump — it feeds low-temperature (4G/5G) networks directly and 3G networks with a smaller lift.

  2. published 2026-07-13 · submitted 2026-07-13 · Chapter 15.7
    PUE category-1 (annualized, fully sub-metered)

    Corrected reversed ISO/IEC 30134-2 PUE categories: Category 3 is the advanced IT-equipment-input measurement; Category 1 is the basic UPS-output figure.

  3. published 2026-07-13 · submitted 2026-07-13 · Chapter 14.9
    NIST SP 800-88 Rev.1

    Updated media-sanitization references to NIST SP 800-88 Revision 2 (final September 2025, superseding Rev. 1).

  4. published 2026-07-13 · submitted 2026-07-13 · Chapter 11.11
    most high-risk-system obligations apply from 2 August 2026

    Updated the EU AI Act timeline for the 2026 omnibus: stand-alone (Annex III) high-risk systems comply from 2 December 2027 and product-embedded systems from 2 August 2028 (Council approval 29 June 2026). Also removed an unreproducible ISO 42001 RFP-share statistic.

  5. published 2026-07-13 · submitted 2026-07-13 · Chapter 5.7
    GB200 ~80 L/min flow, ~2.4 MW cooling capacity

    Replaced the mixed GB200 cooling record with two named OEM profiles: OCP MGX Rack Rev. 1.1 (120 kW, ~85% liquid capture, up to 130 L/min) and HPE GB200 NVL72 (132 kW nominal, 115/17 kW split, 192 kW busway, 1.3 MW in-row CDU for up to 8 racks). Per-rack flow ranges are now labeled as guide derivations.

  6. published 2026-07-13 · submitted 2026-07-13 · Chapter 12.1
    Tier III at 99.982%, Tier IV at 99.995%

    Removed Tier-to-availability-percentage mappings across chapters, quiz, comparison, calculator, and decks — Uptime disavowed those figures; Tier certifies topology properties (concurrent maintainability, fault tolerance). Historical note retained in Chapters 0.4 and 12.1.

  7. published 2026-07-13 · submitted 2026-07-13 · Chapter 13.6
    inducing a fault on the path that should still be carrying load

    Removed the unsafe 2N IST instruction to improvise a second fault on the live surviving path; the test matrix now comes from the facility FMEA with defined preconditions, instrumentation, and abort criteria.

  8. published 2026-07-13 · submitted 2026-07-13 · Chapter 4.8
    the BESS sinks the pulse peaks and sources the troughs

    Reversed BESS power-flow direction corrected: to flatten grid draw the battery discharges into load peaks and recharges in troughs. The unsafe 'commissioned against a real induced grid fault' language was replaced with controlled methods (relay secondary injection, hardware-in-the-loop, planned breaker-opening tests against protected load banks).

  9. published 2026-07-13 · submitted 2026-07-13 · Chapter 0.5
    2(N+1) — sometimes written 2N+1

    Corrected redundancy notation: 2(N+1) and 2N+1 are different topologies (at N=3: eight units vs seven). Also distinguished active/active from active/standby 2N operation.

  10. published 2026-07-13 · submitted 2026-07-13 · Chapter 4.6
    a rack busbar rated to roughly 1,400A

    Corrected NVL72 busbar current: 132 kW at 48 V is ~2,750 A — ~1,400 A is the per-bar rating of the paired busbars (~2,800 A aggregate), consistent with Chapter 7.13.

  11. published 2026-07-13 · submitted 2026-07-13 · Chapter B
    ~266 ML/yr water make-up

    Corrected Appendix B's water arithmetic: WUE is defined per kWh of IT energy, so 50.7 MW IT × 0.5 L/kWh × 8,760 h = ~222 ML/yr (the table had applied WUE to facility energy).

  12. published 2026-07-13 · submitted 2026-07-13 · Chapter 14.11
    ~$9,000/min for cascading incidents

    Fixed a unit error: $300,000/hour is $5,000/minute. The inconsistent $9,000/min figure was removed.

  13. published 2026-07-13 · submitted 2026-07-13 · Chapter 10.6
    a hardware fault every few minutes around the clock

    Corrected the 100k-GPU fault-cadence extrapolation: 7 days per 512 GPUs scales linearly to roughly one fault every ~52 minutes, not every few minutes.

  14. published 2026-07-13 · submitted 2026-07-13 · Chapter 14.3
    together nearly 59% of all failures were GPU/HBM-related

    Corrected the Llama 3 failure arithmetic: faulty GPUs (30.1%) plus HBM3 (17.2%) are 47.3% — the ~58.7% figure is Meta's full GPU-related grouping, now stated separately.

  15. accepted 2026-07-12 · submitted 2026-07-12 · Chapter 2.3

    Busway / busduct lead-time floor eased: ~30–52 wk → ~27–52 wk (VAWN electrical lead-time index, June 2026: standard runs average ~27 wk; custom engineered runs at the top). Same 2026-07-12 fact-check.

  16. accepted 2026-07-12 · submitted 2026-07-12 · Chapter 2.2

    H100/H200 GPU lead time re-stated: 6–12 mo → ~3–12 mo, bimodal — spot H100s improving to weeks while H200 and full enterprise systems sit at the top. Same 2026-07-12 fact-check.

  17. accepted 2026-07-12 · submitted 2026-07-12 · Chapter 2.3

    800G optical transceiver lead-time floor raised: ~20–50 wk → ~36–50 wk. The 20-week floor predated NVIDIA's March 2026 $4B EML pre-buy, which pushed non-priority allocations out. Same 2026-07-12 fact-check.

  18. accepted 2026-07-12 · submitted 2026-07-12 · Chapter 2.3

    HV switchgear & circuit-breaker lead time corrected: ~45–80 wk → ~100–155 wk. The old headline figure described MV-class gear; true HV breakers run ~100–155 wk (Duke Nicholas Institute / Wood Mackenzie). Prose aligned in Ch 2.1 and 2.3. Caught by the 2026-07-12 adversarial fact-check of the Lead-Time Tracker.

  19. accepted 2026-07-11 · submitted 2026-07-11

    Dispatches Atom feed: entry ids were improperly escaped and the feed lacked an RFC-4287 author element; both fixed. Dual adversarial review.

  20. accepted 2026-07-11 · submitted 2026-07-11

    Glossary: “$”-prefixed terms (e.g. $/GPU-hr) matched with wrong word boundaries, creating spurious in-text term links. Dual adversarial review.

  21. accepted 2026-07-11 · submitted 2026-07-11

    Lead-Time Tracker: the register query missed several lead-time figures (regex under-match) and could list the same figure family twice; matching and number-family dedupe fixed. Dual adversarial review.

  22. accepted 2026-07-11 · submitted 2026-07-11

    Project-finance calculator: the IRR solver could return a misleading result for negative-input edge cases; inputs are now clamped and the failure mode returns “—” instead of a wrong number. Dual adversarial review.

  23. accepted 2026-07-11 · submitted 2026-07-11 · Chapter 5.3

    Rear-door heat-exchanger ceiling corrected to ~50–100 kW per rack in chapters that had drifted to lower values — Chapter 5.3 holds the canonical derivation. Caught in the dual adversarial model review (Claude Fable + GPT-5.5 high).

  24. accepted 2026-07-08 · submitted 2026-07-08

    Every figure traced to one vendor blog was removed or re-sourced after the source failed credibility review — the register now carries the replacement citations. Editor-in-chief review pass.

  25. accepted 2026-07-08 · submitted 2026-07-08 · Chapter 3.5

    Behind-the-meter gas fleet sizing corrected to the ~1 GW-class canon for the flagship deployments discussed; prior text overstated it. Editor-in-chief review pass.

  26. accepted 2026-07-08 · submitted 2026-07-08 · Chapter 6.2

    NVL72-class rack weight standardized to the ~3,000 lb canon; earlier chapters carried divergent figures. Editor-in-chief review pass.

  27. accepted 2026-07-08 · submitted 2026-07-08 · Chapter 5.4

    Warm-water direct-to-chip loop temperatures standardized to the 45 °C supply / 65 °C return canon; several chapters carried inconsistent pairs. Editor-in-chief review pass (446 fixes across the guide).